WebComplete Form CS 4401. A Curb Ramp Inspection Form (CS-4401) is required for each curb ramp and will be used for the inspection of all altered curb ramps within the project limits to ensure compliance to PennDOT standards, contract documents, or provided access to the maximum extent feasible. WebChapter 6 – Pedestrian Facilities; Chapter 7 – Driveways. Chapter 9 – Safety Rest Areas and Welcome Centers. Publication 2 -- Project Office Manual (POM) implements the use …
D-6 ADA Policy and Guidance PDF PDF Pedestrian Crossing ...
WebThe Curb Ramp Inspection Form (CS-4401) will be used for the inspection of all altered curb ramps within the project limits to ensure compliance to PennDOT standards or the contract documents. This includes newly constructed curb ramps and existing curb ramps not reconstructed. Refer to publication 13M, Design Manual Part 2 Chapter 6 for additional WebAfter curb ramps are constructed, construction inspectors shall measure curb ramps with ODOT’s approved tools using the current ODOT ADA Curb Ramp Inspection Form corresponding to the type of curb ramp constructed. Methodology for the inspection of the curb ramp shall follow ODOT’s requirements and be conducted by an ODOT rb -racing tirol
PROJECT OFFICE MANUAL - [PDF Document]
WebPerforms design reviews of assigned Americans With Disabilities accessible (ADA) ramp designs including the review of submitted CS-4401 curb ramps inspection forms, … WebHomepage — Colorado Department of Transportation WebJan 2, 2024 · INTRODUCTION The Project Office Manual (POM) is a compilation of Department policies and procedures relating to field administration and inspection of construction contracts. The purpose of the POM is to act as a reference for the appropriate District staffs so they may perform their duties in accordance with Department policies … rbr airflow